Skip to content

Plans

The billing picker shows Free, Pro, Team, and Enterprise. Internally Pro is plan id starter. Free includes 1 seat, 1 project, 1 PRD, and 1 MCP handoff per org. Pro unlocks sprints, AI sprint planning, Copilot, and unlimited MCP handoffs. Team adds seats (5) and more projects. Enterprise is custom.

Plans are billed at the organization level. Extra projects on Pro/Team can use a one-time project unlock. Connected trackers are a separate feature gate (integrations.connected), not their own SKU.

You can start on Free and upgrade when you need more seats, sprints, or agent handoffs; existing PRDs and backlogs are unchanged.

  • Compare Free, Pro, Team, and Enterprise in the feature matrix.
  • See seat, project, PRD, and MCP handoff limits for your plan.
  • Check AI generation and sprint features under your plan.
  • Deciding which plan fits your team size and usage.
  • Checking whether you are close to a Planner seat or AI usage limit.
  • Before inviting a large batch of new Planner seats.
  • Owner role for billing rights; other roles can view plan information read-only.
  • Sidebar: Organization → Billing
  • Direct route: /org/billing
  1. Open Organization → Billing (/org/billing).
  2. Review your current plan, seats, projects, and MCP handoff limit.
  3. Compare Free versus Pro versus Team.
  4. Check current AI generation usage against your plan limit.
  5. Choose Upgrade if you need more seats or higher limits.
  6. Confirm the new plan and verify billing details afterward.
  • You know exactly which plan your organization is on and what it includes.
  • You upgrade before hitting a hard limit, not after being blocked mid-task.
  • Billing changes never come as a surprise to whoever owns the budget.
  • Contact billing support if checkout fails after a payment attempt rather than retrying blindly.
  • Watch Planner seat count before a big hiring wave; upgrading ahead of time avoids a mid-onboarding scramble.
  • Free is a genuinely usable plan for small teams, not just a trial; upgrade only when you actually need more.
  • Waiting until a hard limit blocks work before checking whether an upgrade is needed.
  • Assuming plan changes are per-project when they actually apply to the whole organization.
  • Not checking Planner seat count before sending a batch of new invites.